FAQ
Practical answers
before you brief.
MOQ, sampling, lead times, testing and factory visits — the details that make a mattress programme easier to plan.
Good questions
Before you
send a brief.
The practical details buyers ask us most often. If your question is not here, send it over — we answer directly.
What is your minimum order quantity?
Our standard MOQ is 100 pieces per model, with mixed sizes allowed. We can discuss smaller trial orders for new programmes; the right answer depends on materials, packaging and the sample plan.
How long does sampling take?
Typical sample development is 7–10 working days after we confirm the specification and receive any reference materials. Complex covers, special foams or new tooling may take longer.
What is your production lead time?
Production usually runs 25–35 days after sample approval and receipt of deposit. We confirm the exact window against material availability and the packaging format.
Can you manufacture to our sizes and firmness?
Yes. We build to metric and imperial sizes, including single, double, queen, king and custom dimensions. Firmness is developed through spring profile, foam density and layer construction, then locked against an approved sample.
Do you offer roll-packed and compressed mattresses?
Yes. We produce flat-packed, vacuum-compressed and roll-packed mattresses, with carton or bag options. We can recommend a format based on your freight, fulfilment and returns profile.
Can you support certification and testing?
We can prepare products for third-party testing against target-market requirements such as CFR 1633, REACH, OEKO-TEX and ISTA packaging protocols. Certificates are issued by the testing body, not by Dekui.
What are your payment terms?
Our standard terms are a deposit with the balance against the pre-shipment inspection or bill of lading. Terms are confirmed in the quotation and can be discussed for repeat programmes.
Can we visit or audit the factory?
Yes. We welcome factory visits and third-party audits in Changshu. Please contact us with your preferred dates and audit scope so we can prepare the team and documentation.